We’re adding a second row of racking in our Sharjah warehouse to cope with more stock and it only occurred to me yesterday that we might need approval before installing it, not after. The first set went up years ago before my time and I have no idea if it was ever signed off, so I can’t exactly use it as a template. The supplier is happy to install whenever, which is part of the problem, they don’t seem concerned about permits at all. I’d rather do this properly than get caught out later by an inspector or an insurance issue. I’ve been reading about racking fire safety rules in Sharjah and it seems like layout, spacing and clearance all factor in, and there may be documentation requirements too. Has anyone gone through this recently, did you need to submit anything before the racking went up, or is it only checked at inspection time?